This Hydro Trip Sub can be used for classification in pipe string, opening step by step. After the Hydro Trip Sub is opened, there is no falling object at the bottom of the well, and the tubing diameter can be guaranteed without drilling. It is used to set the packer in deep wells, highly deviated wells, horizontal wells with low packer setting force and difficult string tripping operation.
Contact Us
Specification |
|||||
Tubing size |
Max.OD |
ID(after shifting) |
|||
in |
mm |
in |
mm |
in |
mm |
2 7/8 |
73.03 |
3.307 |
84.00 |
1.700 |
43.18 |
3.688 |
96.65 |
||||
3.937 |
100.00 |
2.417 |
61.40 |
||
3 1/2 |
89 |
4.500 |
114.30 |
2.540 |
64.52 |
2.953 |
75.01 |
Contact Us
(0571)85066306
中文