Recoverable Production Completion Applications

时间:2024-01-12阅读: 161次

Process Description:

Due to the diversified nature of oil and gas reservoirs, some oil and gas wells need to be lifted out and replaced with oil and gas tubing columns after a certain period of exploitation, and the oil and gas cut-offs are treated accordingly to increase the production of the wells, and then the well completion operation is carried out again. For some oil and gas wells, the development of a set of reusable downhole equipment can reduce the development cost of oil and gas wells.

To this end, Yehee Energy has prepared high-quality downhole equipment for its customers, customising the products according to the actual needs of the customers to meet the actual needs of different well conditions. The complete solution includes downhole equipment such as tubing retrievable downhole safety valves, removable packers, fluid control tools, telescopic knuckle swappable slipcovers, and other tools necessary for installation and safe execution.

 

Process Features:

● The packer adopts retrievable design, and the tubing column can be taken out for replacement and modification at a later stage;

● The design of the packer can fit various steel grade casing with high stability of anchoring;

● The design of pipe column can realise large diameter, which improves the production diameter and the internal operation measures;

● Various types of packer can be selected to meet different well structure designs.